C
CUBICCONSTRUCTION • JOHN SISK
ARCHITECTURAL CASE STUDIES // MONOGRAPH SERIES

SELECTED COMMISSIONS & CASE STUDIES.

Every project represents a complex structural challenge resolved through rigorous physical craftsmanship. Explore full-bleed project plates, load-transfer details, and architectural finishes executed by Cubic Construction across the East Valley.

PORTFOLIO EXECUTED: 65,000+ SF
STRUCTURAL TOLERANCE: L/480 MAXIMUM DEFLECTION
DIRECT ON-SITE SUPERVISION
PLATE 01 • COMMISSION NO. 048
CUSTOM WATERFRONT RESIDENCE•5,400 SQ FT

Ocotillo Waterfront Whole-Home Reconstruction

Complete structural gut, open-concept load transfer, and modern desert interior

Location: Chandler, AZ | Scope: 5,400 SF Whole-Home Reconstruction | Timeline: 8 Months
AS-BUILT ARCHITECTURAL SPEC
Demolition phase: Structural masonry removal, temporary shores, and steel beam rigging.
PHASE 01: STRUCTURAL SHORING & DEMOLITION
STRUCTURAL VERIFICATION DETAIL:
Demolition phase: Structural masonry removal, temporary shores, and steel beam rigging.
Completed residence: Unobstructed column-free living pavilion with flush ceiling planes.
FINAL MONOGRAPH: ARCHITECTURAL COMPLETION
ARCHITECTURAL REVEAL DETAIL:
Completed residence: Unobstructed column-free living pavilion with flush ceiling planes.

COMMISSION OVERVIEW & EXECUTION

A complete structural transformation of an early 2000s Mediterranean residence into a clean-lined modern architectural monolith. By eliminating interior masonry partitions and flush-framing wide-flange structural steel beams, John opened up 50 feet of uninterrupted waterfront views. John directed every trade daily on site from initial demolition through final trim verification.

STRUCTURAL HURDLES

  • >Demolition of a 42-foot central masonry load-bearing wall dividing kitchen, formal dining, and living rooms.
  • >Engineered twin concealed W12x50 structural steel beams flush within ceiling cavity to eliminate downward soffits.
  • >Excavation and pouring of two reinforced micropile footings beneath existing post-tension foundation slab.

CUSTOM FINISHES

  • >Board-formed architectural concrete fireplace monolith with integrated blackened-steel hearth
  • >Full-height rift-sawn white oak architectural millwork and hidden flush pivot doors
  • >Honed Taj Mahal quartzite waterfall slabs with zero-tolerance mitered edges
PLATE 02 • COMMISSION NO. 052
ARCHITECTURAL ADDITION•2,400 SQ FT Added

Desert Foothills Cantilever Lanai & Guest Wing

Seamless structural addition with 16-foot column-free corner glass opening

Location: North Scottsdale Border | Scope: 2,400 SF Structural Addition | Timeline: 5 Months
AS-BUILT ARCHITECTURAL SPEC
Structural steel erection and cantilever tie-in framing under laser verification.
PHASE 01: STEEL CANTILEVER ERECTION
STRUCTURAL VERIFICATION DETAIL:
Structural steel erection and cantilever tie-in framing under laser verification.
Completed cantilever structure: Disappearing pocket doors and seamless stone planes.
FINAL MONOGRAPH: ARCHITECTURAL COMPLETION
ARCHITECTURAL REVEAL DETAIL:
Completed cantilever structure: Disappearing pocket doors and seamless stone planes.

COMMISSION OVERVIEW & EXECUTION

Engineered to blend indoor desert living with monumental outdoor shaded space. The architectural addition required extensive structural coordination to tie a flat cantilevered roof system into existing complex tile rooflines without risking monsoon water accumulation or ceiling sagging.

STRUCTURAL HURDLES

  • >Cantilevered steel roof canopy extending 16 feet past the building footprint without exterior corner columns.
  • >Integrated Simpson Strong-Wall moment frames anchored into bedrock to resist desert wind shear loads.
  • >Precision header leveling with zero deflection tolerance for 24-foot pocketing multi-slide glass panels.

CUSTOM FINISHES

  • >Custom architectural oxidized Arizona copper fascia wraps and perforated soffit panels
  • >Sandblasted structural steel columns with exposed high-strength hex bolting
  • >Continuous honed basalt flagstone running uninterrupted from interior living out to pool deck
PLATE 03 • COMMISSION NO. 039
COMMERCIAL TENANT IMPROVEMENT•8,900 SQ FT

San Tan Precision Innovation Lab & Executive Suites

High-tolerance commercial tenant improvement with reinforced mezzanine framing

Location: Gilbert Tech Park | Scope: 8,900 SF Commercial TI | Timeline: 6 Months
AS-BUILT ARCHITECTURAL SPEC
Rough-in stage: Heavy MEP trenching, mezzanine steel framework, and fire-assembly framing.
PHASE 01: COMMERCIAL CORE ROUGH-IN
STRUCTURAL VERIFICATION DETAIL:
Rough-in stage: Heavy MEP trenching, mezzanine steel framework, and fire-assembly framing.
Turnkey delivery: Acoustic glass suites, polished concrete slabs, and linear lighting.
FINAL MONOGRAPH: ARCHITECTURAL COMPLETION
ARCHITECTURAL REVEAL DETAIL:
Turnkey delivery: Acoustic glass suites, polished concrete slabs, and linear lighting.

COMMISSION OVERVIEW & EXECUTION

A fast-track commercial tenant improvement executed within strict municipal inspection schedules. John coordinated all mechanical, electrical, and structural trades to deliver an industrial research laboratory and executive office suite on time and within budget.

STRUCTURAL HURDLES

  • >Slab trenching and vibration isolation cuts for sensitive laser measuring instrumentation.
  • >Structural steel mezzanine floor addition designed for 125 PSF live equipment storage load.
  • >Multi-zone 2-hour fire-rated wall assemblies with complex overhead MEP ducting penetrations.

CUSTOM FINISHES

  • >Diamond-ground high-gloss concrete floors with densified anti-dusting sealers
  • >Custom industrial blackened-steel storefront glazing systems and acoustic double-glazed panels
  • >Exposed acoustic wood slat ceilings with integrated architectural linear LED channels
COMMISSION INQUIRY

CONSULT DIRECTLY WITH MASTER BUILDER JOHN SISK.

Submit your architectural permit sets, engineering sketches, or site condition photographs for immediate feasibility and scheduling consultation.

Build Scope Brief